Skip to main content
LUNASEN-Scapes
CallEnquire

LUNASEN-Scapes

Dig offs

Garden dig off and formation

The finish fails if the dig is thin.

We take the old surface off and set a level.

This is the part playground suppliers skip.

Home/Work/Garden dig off and formation

LUNA SEN-Scapes garden dig off: yellow high-tip site dumper and mini excavator on excavated wet soil in a fenced UK family garden, ready for formation level
Dumper, excavator, spoil away — formation before the pretty layer.

The brief

The garden surface was wrong for what had to sit on it.

A wheelchair path, a patio or a play layer cannot go on mud and a guess.

They needed spoil off site, a true formation, and the fence left standing.

Groundworks and build

A mini excavator breaks out the old ground on a tight family plot.

A high-tip site dumper takes spoil away so the formation stays clean.

We work to a level, not a dip in the middle of the yard.

Existing close-board fencing stays. Access and barrow routes are planned first.

Drainage and paving come after this photo — not instead of it.

  • Mini excavator
  • High-tip site dumper
  • Formation level
  • Spoil away

The outcome

A clean dig. A level you can build on.

Ready for drainage, paving, turf or inclusive surfacing.

The same crew stays on for the finish.

Related services and areas

This job sits on the same LUNA SEN-Scapes brief as the service pages.

Wirral is the base. The work is UK-wide.

More on the ground

Request a site visit

Send a postcode and photos.

Garden makeover, patio, fencing, dig off or a driveway.

We will say if a visit makes sense.

Request a Site Visit